|
Bayer
Project Description:
This pharmaceutical laboratory features the rugged Manchester Series painted steel casework with grey epoxy worksurfaces. As you will notice from the photos the lab is full of plumbing and electrical fixtures for all types of applications. This project required intensive coordination with the plumbing contractor for locations and pipe chases, the electrical contractor for the mounting of the electrical raceways, and the HVAC contractor for the connection and safe operation of the Pro Series fume hoods. One of the photos shows access panels removed for access to plumbing gauges and shut off valves.
|
|