project portfolio




create a portfolio to save your resources
- case study
- featured products
Have questions about this project?
Ask our teamJOB NAME: Pharmaceutical Company | 9th Floor Renovation
ARCHITECT: N/A
CONTRACTOR: Sterling Construction
With Sterling Construction renovating the 9th Floor of 451 D Street as one of many spec labs in Related Beal’s real estate developments, NEL Direct was chosen to provide products with a quick turnaround time. The fit-up features mobile, height-adjustable Cambridge Series tables with strut overhead shelving and electrical strip assemblies. Bright White painted steel base cabinets and sink stations were equipped with epoxy tops. Bench-mounted fume hoods and specialty cabinets complete the new space for Inozyme Pharma’s research and development group.